Raise a work order

Work orders start from the BOM. Open a product's Committed Area, find the row you want to build, and use the + on that row.

Choose a product row to build the whole product, or an assembly row to build just that assembly.

72-create-work-order.webpThe create flow, opened from the + on a committed BOM row, showing the target and quantity.

What you fill in

Field Notes
Quantity How many to build. Drives the whole material plan
Name Defaults from the item; change it if this build needs distinguishing
Priority Used for sorting and filtering the list
Planned dates Start and end. An order past its end date is flagged Overdue in the list
Assigned to Who is responsible for the build overall
Attachments Drawings, instructions, anything the shop needs

Review the material plan

Enter a quantity to see the required materials and available stock. Review any shortages before creating the order.

Each line shows:

See The material plan for how the quantities are worked out.

Steps

Below the plan you lay out the operations. Each one gets a name, a type, optionally an owner and dates, and the material it pulls.

At minimum a build needs one step — you cannot submit an order with none. Most builds have a pick step to get the material and one or more process steps to do the work.

What happens when you create it

When you create the order:

  1. The order is saved in the Draft state.
  2. Stock is reserved for every line the plan found, oldest lot first. Each line records what it actually got.
  3. Anything short becomes purchase lines on the purchase step.

A shortage needs a purchase step

If there is a shortage and no purchase step to carry it, creation is refused and names the parts involved. A shortage appearing now means stock moved while you were planning, so the plan you are looking at is out of date. Reload it rather than proceeding on numbers that are no longer true.

After it exists

The order is saved as a draft, with stock reserved. You can cancel the draft to release those reservations.

When it is ready, submit it for approval. See Submit and approve.