The material plan

The material plan lists the parts and quantities needed for the build, calculated from the bill of materials (BOM).

Partix creates the plan from the released BOM. You cannot add lines to it manually.

73-material-plan.webpThe material plan step, with required, available and short for each required part.

How materials are calculated

Partix checks the stock available for each item in the BOM:

For example, if a build needs four gearboxes and three are in stock, the plan uses those three and adds the parts needed to build one more.

Stock is counted only once

If a part appears in several places in the BOM, they share the available stock. Five units in stock cover five units in total. Items nearer the top of the BOM use stock first.

Quantities: net and gross

Net What the structure calls for — quantity per unit times the build quantity
Gross Net plus overage, which is what actually gets reserved

Overage is configured on the part, as a percentage or a fixed amount, for material you expect to lose in processing. When the unit of measure cannot be split, the gross is rounded up — you cannot reserve two-thirds of a connector.

The plan shows both quantities so you can see how much extra material is included.

Availability and shortage

Each line reports what is on hand against what it needs. Anything the reservation could not cover shows as short.

For help with missing material, see When material is short.

One line per part

Lines are merged by part. If the same fastener appears in six places in the structure, the plan has one line for it with the demand added up, not six lines to reconcile.

Each line keeps a trail showing where in the structure the demand came from, so you can still answer "why does this build need 48 of these?"

The plan is frozen at creation

Once the order exists, its plan is a record of what was decided. Later edits to the BOM do not reach back into a work order that is already running.

To build a changed structure, raise a new order against the new revision.

Unit cost is frozen too

Each line stores the unit cost at the moment of planning, so a later price edit cannot move what this build was planned to cost. The cost the build is actually charged comes from what was issued — see How a build is costed.