Glossary
Common terms used in work orders.
| Term | Meaning |
|---|---|
| Build target | The item a work order is making, at one exact released revision. A product or an assembly at any depth. |
| Closed | All costs are final. No further changes can be recorded against the order. |
| Completed | Production is finished. Late corrections — scrap, reversals, labor — are still possible. |
| Explode | To calculate the component parts needed to build an assembly. |
| Gross qty | Net plus overage. What actually gets reserved. |
| Issue | The movement that takes material out of stock and into a build. Costed at the value of the lots that left. |
| Lot | A batch of stock sharing an origin and a cost. Finished units are received into a lot of their own. |
| Material plan | The parts and quantities needed for a build, calculated from its BOM. |
| Net qty | What the structure calls for, before overage. |
| On hold | Paused, with a reason. Keeps its reservation. |
| Operation | A step of the build. Carries its own material and its own completion. |
| Overage | Extra material added to a requirement to cover expected process loss. Set on the part. |
| Reason code | A coded entry from one of four configured lists — hold, cancel, reject, scrap — recorded alongside the note. |
| Receipt | A batch of finished units coming back as stock, with its own cost and its own lot. |
| Release | The mechanism that moves stock. A work order never touches inventory directly. |
| Reservation | Stock held for one build and no other, placed when the order is created. Still on the shelf, just spoken for. |
| Reversal | Undoing an issue that was wrong. A deliberate movement of its own, not an undo button. |
| Shortfall | What the reservation could not cover. Written onto the purchase step as work to be done. |
| Step | See Operation. |
| Transition | A change from one status to another, such as Draft to Pending. |
| Unplanned material | A part consumed by a build that the structure did not call for, recorded as such. |
| WIP | Work in progress. Where the value sits between material being issued and units being received. |